From 50 kWh commercial systems to 20+ MWh grid-scale installations — TESAS designs, engineers, and commissions Battery Energy Storage Systems that reduce peak demand charges, enable renewable integration, and provide reliable backup power.
TESAS offers a full-spectrum BESS service — from initial feasibility and detailed design to procurement, commissioning, and long-term O&M. We are chemistry-agnostic and select LFP, NMC, or flow batteries based on your load profile, safety requirements, and capex budget.
Detailed tariff analysis, load profiling, and financial modelling to quantify payback and IRR before any capital commitment.
Half-hourly load simulation to right-size the battery and inverter — no over-sizing, no under-delivery.
Vendor-agnostic sourcing of cells, BMS, PCS, and EMS — we help you get the best price without quality compromise.
Civil, electrical, and control integration — including grid connection approvals, CEA documentation, and DISCOM liaison.
24/7 cloud-monitored SCADA, proactive maintenance contracts, and performance guarantee SLAs.
| Chemistry | Best For | Cycle Life |
|---|---|---|
| LFP (LiFePO₄) | Commercial & Industrial ESS | 4,000–8,000 |
| NMC 811 | High energy density apps | 2,000–4,000 |
| LTO | Fast cycling, cold climates | 15,000+ |
| VRFB (Flow) | Grid-scale, long duration | 20,000+ |
| Scale | Capacity Range | Application |
|---|---|---|
| C&I Small | 50 kWh – 500 kWh | Apartments, offices |
| Industrial | 500 kWh – 5 MWh | Factories, campuses |
| Grid-Scale | 5 MWh – 100+ MWh | Utilities, renewables |
TESAS's proprietary EMS is the intelligent brain of every BESS deployment. It monitors, controls, and optimises your battery assets in real time — coordinating battery dispatch with solar generation, grid tariffs, and load forecasts to maximise savings and minimise cell wear.
MILP-based scheduling engine optimises charge/discharge cycles against day-ahead ToD tariffs and load forecasts — delivering 15–25% higher ROI than simple rule-based controllers.
Seamlessly coordinates BESS with rooftop solar, diesel gensets, and EV chargers — single pane of glass for all on-site energy assets.
ML-based degradation modelling adjusts charge rates and depth of discharge to extend battery life by up to 20%, protecting your capex.
Web dashboard + mobile app for real-time energy flow monitoring, operating mode changes, and fault alerts. IEC 61850 and Modbus TCP compatible.
PDF reports showing kWh throughput, peak demand reduction, CO₂ avoided, and financial savings vs. your pre-BESS baseline.
TESAS integrates containerised BESS units with proven PCS partners — CATL, BYD, Delta, SMA, Sungrow — delivering reliable, scalable, and fully serviceable energy storage installations.
Turnkey container BESS units — pre-assembled, factory-tested, and ready for rapid deployment. Available in 20-ft and 40-ft ISO container formats.
| Capacity Range | 500 kWh – 5 MWh per container |
| DC Voltage | 750V – 1500V DC bus |
| Chemistry | LFP (standard) / NMC (high-density) |
| Cooling | Precision air / liquid cooling |
| Protection | IP54, fire suppression (Novec) |
| Certifications | IEC 62619, UN38.3, BIS |
We partner with global PCS leaders — Delta, SMA, Sungrow, and Huawei — to source the right bidirectional inverter for your grid connection, power rating, and budget.
| Power Range | 100 kW – 6 MW per unit |
| Grid Interface | LV (415V) / MV (11kV/33kV) |
| Round-Trip Efficiency | >96% (PCS + battery) |
| Grid Compliance | IEC 61727, CEA 2010 |
| Response Time | <20ms frequency response |
| Communications | Modbus TCP, DNP3, IEC 61850 |
We deliver BESS projects on an Engineering, Procurement & Construction (EPC) basis — managing every phase from feasibility study to handover, so you have a single accountable partner and zero coordination gaps.
Detailed design, SLD, protection relay coordination, structural drawings, and DISCOM / CEA documentation.
Vendor RFQs, FAT at factory, import/logistics, and on-site goods receipt inspection — best price, no compromise on quality.
Civil foundations, container placement, HT/LT electrical, earthing, cable management, and control room fit-out.
SAT execution, grid synchronisation, performance testing, operator training, and 1-year Defects Liability Period.
Our engineers will analyse your electricity bills and site conditions to model your exact BESS savings — free of charge.